<a id="proc-production"></a>

# Mass Production and Pre-Shipment Inspection After Design Confirmation

<a id="proc-production--适用任务与操作前提"></a>

## Applicable Tasks and Prerequisites

After design and deposit confirmation, Panacon arranges mass production, in-process quality control and any required pre-shipment inspection according to the order. [Reference source](https://sz-panacon.com/faq/)

<a id="proc-production--按顺序操作"></a>

## Steps in Order

1. Confirm the design and receive/confirm the deposit [Reference source](https://sz-panacon.com/faq/)
2. Confirm the applicable mass production lead time according to the order [Reference source](https://sz-panacon.com/faq/)
3. Produce according to specifications and perform in-process quality control [Reference source](https://sz-panacon.com/factory-tour/)
4. Arrange third-party pre-shipment inspection as required [Reference source](https://sz-panacon.com/faq/)

## Sources

- [Official source 1](https://sz-panacon.com/faq/)
- [Official source 2](https://sz-panacon.com/factory-tour/)
